You don't have javascript enabled. Good luck with that.
Pencarian
Harga Tanah di Kampung Pulo Capai Rp 20 Juta

Building Design Above Ciliwung River is Refused

The arrangement of Ciliwung river by constructing building above it, is refused by Ministry of Public Works and Public Housing. The considerations are river condition and security.

but the ministry of public works and public housing refused it

“Some people wanted redesign for the river, but the ministry of public works and public housing refused it,” said Basuki T. Purnama, Jakarta Governor, Wednesday (9/28).

According to him, the refusal is make sense since the river flow of Ciliwung is quite heavy.

Ciliwung Normalization Cannot Be Delayed

“According to its structural, the plan is prohibited,” he added.

As the replacement, Basuki prefers to provide more flats as the relocation place for relocated residents. This year, Jakarta Dept. of Public Housing and Government Building constructs 11,142 units

Linked News
Popular News indeks
  1. Nighttime Surveillance on Railroad Banks of Jalan I Gusti Ngurah Rai Intensified

    access_time08-05-2026 remove_red_eye2636 personNurito
  2. Closure of Railway Level Crossings Socialized

    access_time13-05-2026 remove_red_eye2369 personTiyo Surya Sakti
  3. Telkomsel Digiland Run 2026 Parking Lot List: Check Now!

    access_time14-05-2026 remove_red_eye984 personAldi Geri Lumban Tobing
  4. Governor Pram Appreciates Residents for Keeping Jakarta Safe and Comfortable

    access_time09-05-2026 remove_red_eye981 personFolmer
  5. Waste Sorting Movement Boosts Circular Economy

    access_time12-05-2026 remove_red_eye847 personFakhrizal Fakhri